Perth Arena / ARM Architecture + CCN

Perth Arena / ARM Architecture + CCN - Image 1 of 17
© Greg Hocking

Perth Arena / ARM Architecture + CCN - FacadePerth Arena / ARM Architecture + CCN - HandrailPerth Arena / ARM Architecture + CCN - Image 4 of 17Perth Arena / ARM Architecture + CCN - WindowsPerth Arena / ARM Architecture + CCN - More Images+ 12

  • Project Director: Stephen Ashton
  • Jv Director: Dominic Snellgrove
  • Design Director: Howard Raggatt
  • Project Architects: Stephen Davies, Peter Keleman
  • Senior Team Leader: Steve Christie
  • Design Architects: Andrew Lilleyman, Jeremy Stewart, Jonothan Cowle
  • Interior Design: Andrea Wilson, Jacqueline Cunningham
  • Project Team: Luke Davey, Beata Szulc, Jonathan Davis, Greg Stretch, Doug Dickson, Michael Edmonds, Ian Surtees, Deborah Binet, Steve Christie
  • City: Perth
  • Country: Australia
More SpecsLess Specs
Perth Arena / ARM Architecture + CCN - Image 7 of 17
© John Gollings

Text description provided by the architects. The Perth Arena is perhaps like the ancient Greek myth of the Trojan Horse – an object of desire, dragged into great triumph and allowed to bring its rampage of entertainment with it. With up to 15,000 seats, an operable roof for sporting matches, 36 VIP super boxes, five major multi‐purpose event rooms, half a dozen food and beverage outlets and a 700‐space basement car park, the Perth Arena becomes a stand‐alone entertainment extravaganza for the city.

Perth Arena / ARM Architecture + CCN - Facade
© Peter Bennetts

Perth Arena features a retractable roof that can open in seven minutes allowing natural light to flood the centre court. It also features five multi‐purpose event rooms, half a dozen food and beverage outlets, state of the art acoustics, function spaces, corporate hospitality suites, cafes and a basement car park. The stadium has a very flexible design, allowing for crowds of up to 15,500 in general admission concert mode and up to 14,000 in tennis mode. Alternatively, the arena can be closed down for an intimate concert with 3000 people.

Perth Arena / ARM Architecture + CCN - Image 6 of 17
© Peter Bennetts

The striking design was inspired by the 12‐sided Round House in Fremantle and the 209 irregular shaped pieces of Christopher Monckton's Eternity Puzzle. 'This landmark building has been designed to provoke symbolic interpretation, create direct visual responses from all approaches, and become an integral part of the city’s overall urban design and architectural strategy,' said design director Howard Raggatt.

Perth Arena / ARM Architecture + CCN - Image 11 of 17
© John Gollings

Our architectural strategy was simple: provide a core multi‐functional arena without compromise and then surround it with variable circulation and a striking configuration. Most venues of this type provide continuous repetitive spaces around the core function. We have explored this building typology another way. Instead of a singular facade we have created extreme variability, giving the building a different face from every angle. Whether approaching from the elevated freeway to the west, the grand boulevard to the south, the railway lines on the north or new urban developments to the east, every facade presents a new dynamic. It is the interior, and especially the entrance and great public concourses, that best express our vision for the building. Instead of a brutally unimaginative interior, Perth Arena is inspired by the whole experience of a public building, and especially the experience of looking out to the city.

Perth Arena / ARM Architecture + CCN - Image 10 of 17
© John Gollings

Sustainable features include mixed mode natural ventilation to public concourses, displacement air conditioning system through the seating plats reducing energy consumption, photo voltaic (solar) array on the roof, WELLS‐rated fixtures and fittings and waterless urinals, locally sourced materials (e.g. West Australian granite for the entry foyers) and a water sensitive landscape design.

Perth Arena / ARM Architecture + CCN - Beam
© John Gollings

ARM and CCN provided advice to the client on artist selection and were involved in reviews of the final design. Six years in the making, Geoffrey Drake‐Brockman’s 'Totem' draws on sophisticated robotics and schoolyard origami to make a memorable piece of public art. Its moving panels are programmed to open and close like flower petals in response to people walking past and it shoots geometric laser projections onto the wall of the Arena at night. 'Totem' has affectionately become known as the 'Perth Pineapple'.

First Floor Plan

Project gallery

See allShow less

Project location

Address:Perth WA 6000 Australia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Perth Arena / ARM Architecture + CCN" 26 Mar 2012. ArchDaily. Accessed . <https://www.archdaily.com/347615/perth-arena-arm-architecture-ccn> ISSN 0719-8884

© Greg Hocking

西澳大利亚珀斯体育馆 / ARM Architecture + CCN

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.